January 31 , 2008
The UT team placed first in every category, including construction time, construction economy, weight, stiffness, and structural efficiency. The goal of the competition is to design and build a model bridge that can support 2,500 pounds. The UT Team built their winning structure, weighing 135 pounds with a 21 foot span, in roughly 6.5 minutes. The team will participate in the national competition in Gainesville, Florida later this Spring.